AwardedContract AwardWorksTED 107/2026

Establishment of Dublin City Council Multi-Party Framework Agreement for Carrying out Roadwork Contracts 2026-30 (less than 1 million)

Contracting Authority

Publication (OJ)

May 4, 2026

Award Date

May 4, 2026

Estimated Value

€30.0M

Contract Duration

4.0 months

Procedure Type

Restricted procedure

Bids received

9 bids received

Buyer headquarters

Dublin (D08 RF3F) — IE061

Description

Dublin City Council has established a Multi-Party Framework Agreement for Carrying out Roadwork Contracts 2026-30 (less than €1m). The following tenderers were admitted to this Framework Agreement following evaluation of all tenders received. This Framework was established on 4/5/2026. The following are the main elements to the Multi-Party Framework Agreement for Carrying out Roadwork Contracts 2026-30 (less than 1 million): This Framework may involve some of the following work elements: •Installation of ducts, gullies, drainage pipes manholes and chambers •Roadway repairs including potholes(flexible and rigid)•Footway repairs and refurbishment (incld. flags, concrete and bituminous)•Construction and upgrade of footways, cycle tracks, bus stops, cycle lanes and bus lanes • Resurfacing and High friction antiskid surfacing (associated with the work) •Granite and flagging work (high quality finish)•Diversion of services •Road and street improvements (including widening and narrowing)•Development and Implementing of the Traffic Management Plan •Installation of Public Lighting columns •Installation of tactile paving and dishing including installation and upgrade of pedestrian crossings •Installation of Road markings (associated with other roadworks)•Installing bollards, pedestrian barriers, street furniture, signage, cycle parking and shelters etc… •Construction of walls and related works •Installation of Traffic Signal and traffic islands •Trial Holes/Site Investigations/Service Investigation/Geo Referencing/Noise and Vibration Control •Role of PSCS• Public Relations •Road Markings, Weed Control This list is not exhaustive and will include other small works as required under the scope of the framework or works of a similar nature within the expertise of the chosen contractors.

CPV Codes

4523314245233100452331204500000045233121452331244523314045233125

Lots (1)

LOT-0001Dublin City Council has established a Multi-Party Framework Agreement for Carrying out Roadwork Contracts 2026-30 (less than €1m).
€30.0M

Dublin City Council has established a Multi-Party Framework Agreement for Carrying out Roadwork Contracts 2026-30 (less than €1m). The following tenderers were admitted to this Framework Agreement following evaluation of all tenders received. This Framework was established on 4/5/2026. The following are the main elements to the Multi-Party Framework Agreement for Carrying out Roadwork Contracts 2026-30 (less than 1 million): This Framework may involve some of the following work elements: •Installation of ducts, gullies, drainage pipes manholes and chambers •Roadway repairs including potholes(flexible and rigid)•Footway repairs and refurbishment (incld. flags, concrete and bituminous)•Construction and upgrade of footways, cycle tracks, bus stops, cycle lanes and bus lanes • Resurfacing and High friction antiskid surfacing (associated with the work) •Granite and flagging work (high quality finish)•Diversion of services •Road and street improvements (including widening and narrowing)•Development and Implementing of the Traffic Management Plan •Installation of Public Lighting columns •Installation of tactile paving and dishing including installation and upgrade of pedestrian crossings •Installation of Road markings (associated with other roadworks)•Installing bollards, pedestrian barriers, street furniture, signage, cycle parking and shelters etc… •Construction of walls and related works •Installation of Traffic Signal and traffic islands •Trial Holes/Site Investigations/Service Investigation/Geo Referencing/Noise and Vibration Control •Role of PSCS• Public Relations •Road Markings, Weed Control This list is not exhaustive and will include other small works as required under the scope of the framework or works of a similar nature within the expertise of the chosen contractors.

45233142452331004523312045233121452331244500000045233125452331404 months

Award criteria

Ultimate Cost - 100%