โ— OpenContract Notice ยท 16WorksAMP / GPATED 115/2026

N86 Ballynasare Lower to Ballinclare and Doonore North to Ballygarret Road Improvement Scheme

Contracting Authority

Publication (OJ)

Jun 17, 2026

Submission Deadline

Jun 29, 2026 12:00

Estimated Value

โ‚ฌ31.0M

Contract Duration

24.0 months

Procedure Type

Open procedure

Buyer headquarters

Tralee (V92H7VT) โ€” IE053

Execution location

Annascaul โ€” IE053

Description

The N86 National Secondary Road commences in Tralee, and travels west through Blennerville, Camp, Annascaul, Lispole and terminates in Dingle. The N86 Ballynasare Lower to Ballinclare and Doonore North to Ballygarret Road Improvement Scheme comprises two discrete sections which are selected to maximise re-use of acceptable material on the subject scheme and on the overall scheme. Ballynasare Lower to Ballinclare. This section of the scheme is approximately 3.8km in length and extends from the townland of Ballynasare Lower in the west to the townland of Ballinclare at the western end of Annascaul village. Doonore North to Ballygarret. This section of the scheme is approximately 2.25km in length and extends from the townland of Doonore North in the west to the townland of Ballygarret in the east.

CPV Codes

4523312045233121

Lots (1)

LOT-0001N86 Ballynasare Lower to Ballinclare and Doonore North to Ballygarret Road Improvement Scheme
โ‚ฌ31.0M

The N86 National Secondary Road commences in Tralee, and travels west through Blennerville, Camp, Annascaul, Lispole and terminates in Dingle. The N86 Ballynasare Lower to Ballinclare and Doonore North to Ballygarret Road Improvement Scheme comprises two discrete sections which are selected to maximise re-use of acceptable material on the subject scheme and on the overall scheme. Ballynasare Lower to Ballinclare. This section of the scheme is approximately 3.8km in length and extends from the townland of Ballynasare Lower in the west to the townland of Ballinclare at the western end of Annascaul village. Doonore North to Ballygarret. This section of the scheme is approximately 2.25km in length and extends from the townland of Doonore North in the west to the townland of Ballygarret in the east.

452331204523312124 months

Review procedures

Review body

The High Court of Ireland โ€” Dublin

More notices from this buyer