St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
Contracting Authority
Publication (OJ)
Submission Deadline
Estimated Value
Contract Duration
Procedure Type
Buyer headquarters
Sector
Description
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.
CPV Codes
Lots (1)
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.