ExpiredContract NoticeWorksTED 100/2026

St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works

Contracting Authority

Publication (OJ)

May 25, 2026

Submission Deadline

Jun 8, 2026

Estimated Value

โ‚ฌ195,000

Contract Duration

24.0 months

Procedure Type

Open procedure

Buyer headquarters

Athenry (H65 T680) โ€” IE042

Description

The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.

CPV Codes

453100004531500045330000421600004533111031625000

Lots (1)

LOT-0001St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
โ‚ฌ195,000

The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.

45310000453150004533000042160000453311103162500024 months