AwardedContract AwardServicesTED 100/2026

Appointment of an Integrated Design Team for UCC Outdoor Sports Facilities - Phase 1

Contracting Authority

Publication (OJ)

Apr 15, 2026

Award Date

Apr 15, 2026

Estimated Value

โ‚ฌ1.0M

Contract Duration

6.0 months

Procedure Type

Restricted procedure

Bids received

5 bids received

Buyer headquarters

Cork (T12 VH39) โ€” IE053

Description

This competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrated team are โ€ข Civil and Structural Engineering Services (CSE) โ€ข Architectural Services (AS). โ€ข Mechanical and Electrical Engineering Services (MEP). โ€ข Project Supervisor Design Process (PSDP). The first phase to be delivered under the developed master plan is to include the following works. โ€ข Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. โ€ข Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. โ€ข The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)

CPV Codes

71300000713200007132200071311000713120007131300071317100713172107133200071334000712000007122000071240000714200007153000071314000

Lots (1)

LOT-0001Appointment of an Integrated Design Team for UCC Outdoor Sports Facilities - Phase 1
โ‚ฌ1.0M

This competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrated team are โ€ข Civil and Structural Engineering Services (CSE) โ€ข Architectural Services (AS). โ€ข Mechanical and Electrical Engineering Services (MEP). โ€ข Project Supervisor Design Process (PSDP). The first phase to be delivered under the developed master plan is to include the following works. โ€ข Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. โ€ข Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. โ€ข The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)

713000007132000071322000713110007131200071313000713171007131721071332000713340007120000071220000712400007142000071530000713140006 months

Award criteria

Cost at 20%

More notices from this buyer